Do you need planning permission for an extension?

Permitted development, prior approval, Building Regulations and party walls, explained in plain English for homeowners in North East Lincolnshire.

7 min read · Updated November 2026

The first question most people ask about an extension is "do I need planning permission?". The answer is often "not necessarily", but there are two separate sets of rules, and almost every extension needs at least one of them.

Planning permission and Building Regulations are different things

Planning is about what the extension looks like and its effect on neighbours and the area. Building Regulations are about how it's built: structure, fire safety, insulation, drainage and ventilation. You can need one, both, or (rarely) neither. In North East Lincolnshire, both are dealt with through North East Lincolnshire Council, though building control can also be done by an approved private inspector.

Permitted development: extending without a planning application

Houses in England have "permitted development" rights, which allow certain extensions without a full planning application. The main rules for a single-storey rear extension are:

  • It can extend up to 3 metres beyond the original rear wall of a semi-detached or terraced house, or 4 metres on a detached house.
  • Under the prior approval (larger home extension) process, where the council notifies neighbours first, this can be up to 6 metres (semi or terrace) or 8 metres (detached).
  • Maximum height 4 metres, and eaves no more than 3 metres if within 2 metres of a boundary.
  • Materials should be similar in appearance to the existing house.
  • Together with other extensions and outbuildings, it can't cover more than half the garden around the original house.

"Original house" means the house as it was first built (or as it stood on 1 July 1948). Earlier extensions count towards the limits.

Side extensions under permitted development must be single-storey, no more than 4 metres high, and no wider than half the width of the original house. Extensions to the front, or towards a road at the side, normally need planning permission. Two-storey rear extensions have tighter limits, including staying at least 7 metres from the rear boundary.

When you will need planning permission

  • Your extension goes beyond the permitted development limits.
  • Your house is a flat or maisonette. These don't have the same rights.
  • Your house is listed, or in a conservation area, where rights are restricted. There are conservation areas in Cleethorpes, parts of Grimsby and several villages.
  • Your permitted development rights have been removed by a planning condition. This is common on newer estates, including some around Humberston, New Waltham and Waltham. Check the original planning permission for your house.
  • You want to extend at the front, or with more than one storey at the side.

Getting certainty

If you're building under permitted development, it's worth applying for a Lawful Development Certificate. It's formal confirmation from the council that your extension is lawful, and buyers' solicitors increasingly ask for one when you sell.

Building Regulations

Almost all extensions need Building Regulations approval, whether or not they need planning. That covers foundations, structure, insulation, drainage, fire safety and ventilation. It's checked at stages during the build by a building control inspector, and you get a completion certificate at the end. Keep it safe, because you'll need it when you sell.

The Party Wall Act

If you're building on or near a boundary, digging foundations close to a neighbour's, or cutting into a shared wall, you'll probably need to serve notice under the Party Wall etc. Act 1996. It applies regardless of planning. Notice periods are one to two months, so build them into your timetable.

Not sure where your project stands? We'll give you an honest view at the first site visit, and point you to the right designer if you need drawings. See our extensions service.

This guide is a general summary for houses in England as of November 2026. Rules change and every property is different, so always check the Planning Portal or with North East Lincolnshire Council before starting work.

Common questions

How big can I extend without planning permission?
A single-storey rear extension can usually go out 3 metres on a semi or terrace and 4 metres on a detached house under permitted development, or up to 6 or 8 metres using prior approval, subject to height and other limits.
Do I need Building Regulations for a single-storey extension?
Almost always, yes. Building Regulations apply whether or not you need planning permission.
How long does a planning application take?
Householder applications are normally decided within 8 weeks of being validated. Prior approval for larger rear extensions has a 42-day period.